LOAN REQUEST (619) 617-2797
Back to Blog

INSIGHTS & RESOURCES CONSTRUCTION LOANS

CONSTRUCTION LOANS

California Land Loans: How to Finance a Lot

October 7, 2026 8 min read

Milad Shamoun
Milad Shamoun FOUNDER & CEO

Yes, you can get a loan on land in California, but not on the terms you would get on a house. Land produces no income, its value depends on what can be built on it and when, and lenders that do lend on it lend less. This post covers why land is financed differently, how a parcelโ€™s status changes the loan, the questions that decide it, what our published products allow and how a land loan ends.

It is written for land bought as an investment or to develop. A lot for a home you will live in is a different, consumer purpose conversation: owner-occupied homes go through our owner occupied program, which runs on consumer rules, and nothing below describes it.

Why land is financed differently

Three things set land apart from every other property a lender sees.

It produces no income. A rental pays at least part of its own interest. A parcel pays nothing, so every month of interest, property tax and insurance comes from your pocket until the exit. A lender therefore underwrites your liquidity and the exit rather than a cash flow, and often wants the carry reserved or proven up front. Run the numbers through our hard money loan calculator before you make an offer.

It is harder to value. Land trades less often than houses, and two lots on the same street can be worth very different amounts depending on zoning, slope, access and utilities. A parcelโ€™s value is really the value of what can be built on it, discounted for the time and cost to get there.

It is slower to sell. If a loan goes wrong, the lender may have to sell a parcel that has no income and a narrow pool of buyers.

The result, as general market practice, is lower leverage on land than on improved property, shorter terms and closer scrutiny of the plan. Many banks will not finance raw land at all, which is why land buyers so often use cash or private money.

Modern terrace pavilion cut into a hillside
CONSTRUCTION LOANS

Raw, entitled or shovel-ready

The biggest driver of a land loan is how far the parcel has moved toward a building.

  • Raw land has no approvals, often no utilities and sometimes no legal access. It has the longest road to an exit and carries the least leverage.
  • Entitled land has the zoning and the approvals for a specific project. The value has stepped up, and the remaining risk is permits, financing and construction.
  • Shovel-ready land has entitlements, permits and utilities in place, so construction can start. The land loan here is often a short bridge to the construction loan, or the lot is folded into the construction loan itself.

In California, the step from raw to entitled is where time disappears. The California Environmental Quality Act applies to discretionary approvals such as a rezoning, a variance, a conditional use permit or a tentative subdivision map unless an exemption applies, and it does not apply to ministerial approvals (Public Resources Code 21080). A plan that needs a discretionary approval carries review time you cannot fully schedule, and a lender sizes the loan and the term with that in mind.

The questions that decide a land loan

Before value or leverage, a lender wants answers about the parcel itself. These are the questions that sink land deals late:

  • Is it a legal lot? Californiaโ€™s Subdivision Map Act governs how parcels are created. An owner, or a buyer under contract, can ask the city or county to determine whether a parcel complies. If it does, a certificate of compliance is recorded; if it does not, a conditional certificate lists what must be done before development is approved (Government Code 66499.35). A parcel shown on a recorded final map or parcel map already has that status.
  • What does the zoning allow? The use, the density and the setbacks that the zoning and the general plan permit, and whether your plan needs a discretionary approval to get there.
  • Is there legal access? A road you can drive on is not the same as a recorded right to use it. Access shows up on the title report, not on the map.
  • Where are the utilities? Water, sewer or septic and power at the street, or a real cost and timeline to bring them to the lot.
  • What is in the ground? Prior uses, soils and slope. Environmental and geotechnical reports answer questions that would otherwise surface after closing.
  • Where are the lines? A survey and the preliminary title report show the boundaries, easements and encroachments that decide what can be built.

The ground-up construction loan checklist takes the same parcel forward to the build: the team, the plans, the budget and the draws.

What our published products allow

Loan Goat prints its terms on product cards, and only the cards are quoted here. Two of them reach land directly, and a third uses equity you already hold.

The hard money commercial bridge. The hard money commercial bridge is the one published card that names land, alongside retail, office, industrial, multifamily and mixed use: up to 70% LTV, 1 or 2 year terms, loans from $150,000 to $25,000,000, rates of 9.00% to 13.00% and a 650 minimum credit score, with closings in as quickly as 3 days on a clean file. That 70% is the cardโ€™s ceiling, not a promise on any parcel. Leverage on a specific piece of land is decided per deal, and it is not the same for raw land, entitled land and a shovel-ready lot. Our land property type page explains how lenders read each.

The ground-up construction loan. If you are building, the lot can sit inside the construction loan. Our construction loan program publishes LTC up to 80% of the lot, the build and the interest reserve, on 12 to 18 month terms with a 600 minimum FICO, for SFR, condo or townhome and 2-4 unit projects, and it asks for two completed ground-up projects. Loans above $4,000,000 need special approval.

An illustration with round numbers, not a quote: a lot at $500,000, a build budget of $1,000,000 and an interest reserve of $100,000 make a total cost of $1,600,000. At 80% LTC the loan is up to $1,280,000, and you bring at least $320,000 plus closing costs. If you already own the lot, its value can count toward that share, depending on how it is valued.

Rates are subject to change, every loan is subject to underwriting, and points and fees are quoted per deal on the Letter of Intent.

Using equity you already own

When the parcel alone will not carry the loan, more collateral can. Our blanket and cross-collateral loans put one loan across several properties when a single asset will not carry the deal, with rates from 8.99% and terms of 1 to 3 years. There is no published LTV, so leverage is quoted per deal.

Two shapes come up with land. You can borrow against rentals you already own and buy the parcel for cash, which strengthens the offer and keeps the land free of debt while you work on the entitlement. Or you can pledge land you already own alongside another investment property, so the pair supports a loan neither would carry alone; whether a given parcel works in the package is decided per deal.

Settle the release before you sign: how much has to be paid down to free each property, and how quickly the release records. Our post on cross-collateralization covers that clause in detail. Keep the home you live in out of it: owner-occupied homes go through our owner occupied program, which runs on consumer rules.

Rooftop terrace looking out over the city
CONSTRUCTION LOANS

Land in San Diego County

San Diego County is short on buildable land. Building sites here come in three forms: knock-down rebuilds on lots that already hold a house, small-lot and 2 to 4 unit infill projects where the zoning allows them, and the remaining lots at the edges of the county. Infill lots are the easiest land to finance, because the utilities are at the street and the exit, a build or a sale to a builder, is close.

The coast adds a permit. Inside the City of San Diego, coastal development in the Coastal Overlay Zone needs a city-issued coastal development permit unless the project is exempt, and the exemptions are written mostly for work on existing structures. On sites inside the California Coastal Commissionโ€™s own permit jurisdiction, the permit comes from the Commission instead (San Diego Municipal Code 126.0702). Put that permit in the timeline before you buy a coastal lot, and set the loan term to match. Outside the city, the county or the city the land sits in sets the rules.

Our page on San Diego construction loans covers the permit clock once the build starts.

The exit: how a land loan ends

A land loan is repaid by an event, and on a 1 or 2 year term that event has to fit the calendar.

  • Sale. The parcel is entitled and sold to a builder at the stepped-up value, or an infill lot is sold to an end user. Closed land sales, not listings, are the evidence.
  • Construction loan takeout. When the permits are issued, the construction loan pays off the land loan, or the lot is rolled into it. Start that conversation while the plans are in review, not when the land loan is about to mature.
  • Refinance. An approval can lift the value enough for a new loan to repay the land loan or to fund the next stage.

Match the term to the approval calendar. An entitlement that lands after the loan matures turns a plan into a refinance under pressure. Our post on the hard money exit strategy shows how lenders test a sale and a refinance.

Where to start

Send the parcelโ€™s address or APN, the price or your cost basis, the zoning and the entitlement status, what you know about access, utilities, the survey and title, your plan and your exit. We will tell you whether it fits one of our published programs and what it would take to close. Send a loan request or call (619) 617-2797.

FAQ

Can you get a loan on land in California?

Yes, though often from a private lender rather than a bank, and at lower leverage than on improved property, because land produces no income and is harder to value and to sell. At Loan Goat the one published card that names land is the hard money commercial bridge: up to 70% LTV, 1 or 2 year terms, $150,000 to $25,000,000, rates of 9.00% to 13.00% and a 650 minimum credit score. Whether a specific parcel fits, and at what leverage, is decided per deal. Rates are subject to change and every loan is subject to underwriting.

How much down payment do you need for a land loan?

It depends on the parcel's status and the lender. The hard money commercial bridge card sets a 70% LTV ceiling, so at that ceiling you bring at least 30% of the value, plus closing costs and the cash to carry the loan, and raw land is usually sized below the ceiling. If you are building, our ground-up construction loan covers up to 80% of the cost of the lot, the build and the interest reserve, so you bring at least 20% of that total.

Is raw land harder to finance than a buildable lot?

Yes. Raw land has no approvals and often no utilities or legal access, so the road to an exit is long and the value is uncertain. Entitled land has the approvals for a specific project, and a shovel-ready lot also has permits and utilities in place. Each step removes risk and time, which is why lenders size and price the three differently.

Can I use land I already own to get a loan?

Often, either on its own or alongside other property. Owned land can be the collateral for a bridge loan, can sit in a blanket or cross-collateral loan with another investment property (rates from 8.99%, 1 to 3 year terms, leverage quoted per deal), or can count toward your share of a ground-up construction project, depending on how it is valued. Whether a specific parcel fits our programs is decided per deal.

How long is a land loan?

Short. The hard money commercial bridge, the card that names land, runs 1 or 2 years, the ground-up construction loan 12 to 18 months and blanket loans 1 to 3 years. Match the term to the approval calendar, because an entitlement that arrives after the loan matures turns the plan into a refinance under pressure.

Do you need a coastal development permit to build on a San Diego lot?

If the lot is in the City of San Diego's Coastal Overlay Zone, plan on it. The city requires a coastal development permit for coastal development in that zone unless the project is exempt, and the exemptions are written mostly for work on existing structures; on sites in the California Coastal Commission's own permit jurisdiction, the permit comes from the Commission. Put the permit in the timeline and the loan term before you buy.

CAN'T FIND YOUR LOAN?

We can get creative too.

SUBMIT A LOAN REQUEST

Or just give us a call now

(619) 617-2797